The Problem
Spider cracks compromising the integrity of the staircase and allowing water to penetrate into the building’s data center underground.
The Solution
The entire repair was complete on a Saturday afternoon after employees vacated the building. The cracks were filled with Belzona 4111 and the entire surface was restored for waterproofing and a long-lasting protection.
Products Applied
Belzona 4111


Safety Grip System
The Problem
The safety grip systems in place on 3 separate sets of steps were ageing and no longer performing as intended. This was presenting a significant slip and trip hazard for the staff and students using the facility, warranting them to investigate a suitable replacement for the long term.
The Solution
First, the existing grip system was removed from the concrete steps and preparation began to ensure a firm and clean substrate. Due to water ingress underneath the metal plates, the was some spalling concrete around the anchor points. Belzona 4141 was used to reform these areas and provide a neat edge on to which the new grip system could be applied. The Belzona 4411 and Belzona 9211 units were mixed then together and applied on to the concrete step nosings in strips
Products Applied
Belzona 4411, Belzona 4141, Belzona 9211


Concrete Overhead Repair
The Problem
The flooring of a large company in the industry of surface coating of metals and plastics had deteriorated which required a long lasting chemical resistant floor coating.
The Solution
The concrete substrate was abraded to expose the aggregate, the surface was sprayed with Belzona 5811 using airless spraying equipment. The expansion joints were filled using Belzona 4521.
Products Applied